SPP request GEN-2021-019

SPP queue ID GEN-2021-019

Queue request GEN-2021-019 was listed in the SPP interconnection queue at the end of 2025 as a 74.9 MW battery project in Noble County, OK, according to Berkeley Lab’s queue data file. The filing names Sooner as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2028.

Queue IDGEN-2021-019
Project nameNot reported
Status (as published)Active
SubstationSooner
Point of interconnectionSooner 345 kV
CountyNoble
StateOK
Voltage345 kV
Capacity74.9 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sooner substation: 5 requests in the SPP queue, 3 active totaling 605.9 MW.

Queue IDProjectMWResourceStatus
GEN-2015-047Not reported300WindOperational
GEN-2021-018Not reported231SolarActive
GEN-2015-030Not reported200.1WindWithdrawn
GEN-2016-048Not reported82.3SolarWithdrawn

Noble, OK: 17 requests in the SPP queue, 7 active totaling 1,173.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2021-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2021-04-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.