Sooner substation interconnection queue

3 active projects totaling 605.9 MW in the SPP queue, plus 2 with terminal status (shown grayed).

5 SPP queue filings name Sooner as the point of interconnection, all in OK.

3active projects
605.9active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-047 Not reported 345 300 Wind Operational
GEN-2021-018 Not reported 345 231 Solar Active
GEN-2015-030 Not reported 345 200.1 Wind Withdrawn
GEN-2016-048 Not reported 138 82.3 Solar Withdrawn
GEN-2021-019 Not reported 345 74.9 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.