Substation Scout

Noble, OK interconnection queue

7 active projects totaling 1,173.9 MW in the SPP queue, plus 10 with terminal status (shown grayed).

7active projects
1,173.9active MW
17total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-037 Not reported n/r 900 Coal Withdrawn
GEN-2021-071 Not reported 345 403.2 Wind Withdrawn
GEN-2008-111 Not reported n/r 400 Wind Withdrawn
GEN-2015-047 Not reported 345 300 Wind Operational
GEN-2021-018 Not reported 345 231 Solar Active
GEN-2025-SR8 Not reported 345 220 Battery Active
GEN-2015-030 Not reported 345 200.1 Wind Withdrawn
GEN-2016-101 Not reported 345 195 Wind Withdrawn
GEN-2015-067 Not reported 138 150 Solar Withdrawn
GEN-2024-056 Not reported 138 120 Solar Active
GEN-2025-SR12 Not reported n/r 116 Battery Active
GEN-2025-SR11 Not reported n/r 112 Battery Active
GEN-2008-104 Not reported n/r 100 Wind Withdrawn
GEN-2008-105 Not reported n/r 100 Wind Withdrawn
GEN-2016-100 Not reported 345 100 Wind Withdrawn
GEN-2021-019 Not reported 345 74.9 Battery Active
GEN-2005-019 Not reported n/r 32 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.