SPP request GEN-2020-054

SPP queue ID GEN-2020-054

Queue request GEN-2020-054 was listed in the SPP interconnection queue at the end of 2025 as a 298 MW solar project in Bowie County, TX, according to Berkeley Lab’s queue data file. The filing names Lydia Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 12, 2027.

Queue IDGEN-2020-054
Project nameNot reported
Status (as published)Active
SubstationLydia Station
Point of interconnectionLydia 345 kV Station
CountyBowie
StateTX
Voltage345 kV
Capacity298 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-11-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lydia Station substation: 2 requests in the SPP queue, 1 active totaling 298 MW.

Queue IDProjectMWResourceStatus
GEN-2020-055Not reported71BatteryWithdrawn

Bowie, TX: 12 requests in the SPP queue, 5 active totaling 900 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2020-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2020-04-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.