Substation Scout

Lydia Station substation interconnection queue

1 active project totaling 298 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Lydia Station as the point of interconnection, all in Bowie County, TX.

1active projects
298active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-054 Not reported 345 298 Solar Active
GEN-2020-055 Not reported 345 71 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first