SPP request GEN-2018-089

SPP queue ID GEN-2018-089

Queue request GEN-2018-089 was listed in the SPP interconnection queue at the end of 2025 as a 196 MW wind project in Castro County, TX, according to Berkeley Lab’s queue data file. The filing names Newhart Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.

Queue IDGEN-2018-089
Project nameNot reported
Status (as published)Active
SubstationNewhart Substation
Point of interconnectionNewhart 230kV Substation
CountyCastro
StateTX
Voltage230 kV
Capacity196 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Newhart Substation substation: 6 requests in the SPP queue, 2 active totaling 496 MW.

Queue IDProjectMWResourceStatus
GEN-2024-099Not reported300SolarActive
GEN-2017-176Not reported300HybridWithdrawn
GEN-2022-199Not reported300WindWithdrawn
GEN-2024-100Not reported300WindWithdrawn
GEN-2022-216Not reported250WindWithdrawn

Castro, TX: 14 requests in the SPP queue, 5 active totaling 1,267.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2018-002; 05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2018-11-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.