Castro, TX interconnection queue

5 active projects totaling 1,267.8 MW in the SPP queue, plus 9 with terminal status (shown grayed).

5active projects
1,267.8active MW
14total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-040 Not reported 115 320 Wind Operational
GEN-2017-176 Not reported 230 300 Hybrid Withdrawn
GEN-2022-199 Not reported 230 300 Wind Withdrawn
GEN-2024-050 Not reported 230 300 Hybrid Active
GEN-2024-099 Not reported 230 300 Solar Active
GEN-2024-100 Not reported 230 300 Wind Withdrawn
GEN-2022-216 Not reported 230 250 Wind Withdrawn
GEN-2016-172 Not reported 115 231 Wind Withdrawn
GEN-2017-012 Not reported 230 201.6 Wind Withdrawn
GEN-2007-010 Not reported n/r 200 Wind Withdrawn
GEN-2018-089 Not reported 230 196 Wind Active
GEN-2017-146 Not reported 230 151.8 Wind Active
GEN-2017-084 Not reported 230 89.3 Solar Withdrawn
GEN-2017-079 Not reported 115 49.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.