Newhart Substation substation interconnection queue

2 active projects totaling 496 MW in the SPP queue, plus 4 with terminal status (shown grayed).

6 SPP queue filings name Newhart Substation as the point of interconnection, all in Castro County, TX.

2active projects
496active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-176 Not reported 230 300 Hybrid Withdrawn
GEN-2022-199 Not reported 230 300 Wind Withdrawn
GEN-2024-099 Not reported 230 300 Solar Active
GEN-2024-100 Not reported 230 300 Wind Withdrawn
GEN-2022-216 Not reported 230 250 Wind Withdrawn
GEN-2018-089 Not reported 230 196 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.