SPP request GEN-2017-060

SPP queue ID GEN-2017-060

Queue request GEN-2017-060 was listed in the SPP interconnection queue at the end of 2025 as a 149.4 MW wind project in Barton County, MO, according to Berkeley Lab’s queue data file. The filing names LaRussell Energy Center as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 21, 2021.

Queue IDGEN-2017-060
Project nameNot reported
Status (as published)Operational
SubstationLaRussell Energy Center
Point of interconnectionLaRussell Energy Center 161kV
CountyBarton
StateMO
Voltage161 kV
Capacity149.4 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2021-04-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

LaRussell Energy Center substation: 5 requests in the SPP queue, 5 active totaling 269.4 MW.

Queue IDProjectMWResourceStatus
GEN-2001-030Not reported50GasOperational
GEN-2001-040Not reported50GasOperational
GEN-2016-013Not reported10GasOperational
GEN-2016-014Not reported10GasOperational

Barton, MO: 6 requests in the SPP queue, 3 active totaling 498.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEDE
ClusterDISIS-2017-001; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2017-05-30
Operational date2021-04-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.