3 active projects totaling 498.6 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3active projects
498.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-006 Not reported 345 202 Wind Withdrawn
GEN-2021-026 Not reported 345 200 Solar Withdrawn
GEN-2024-259 Not reported 161 199.8 Hybrid Active
GEN-2017-060 Not reported 161 149.4 Wind Operational
GEN-2017-082 Not reported 161 149.4 Wind Operational
GEN-2022-053 Not reported 345 137.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.