SPP queue ID GEN-2017-040

Queue request GEN-2017-040 was listed in the SPP interconnection queue at the end of 2025 as a 200.1 MW solar project in Ochiltree County, TX, according to Berkeley Lab’s queue data file. The filing names Canadian River-Muskogee and Muskogee-Seminole as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2017-040
Project nameNot reported
Status (as published)Active
SubstationCanadian River-Muskogee and Muskogee-Seminole
Point of interconnectionCanadian River-Muskogee and Muskogee-Seminole 345kV
CountyOchiltree
StateTX
Voltage345 kV
Capacity200.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Canadian River-Muskogee and Muskogee-Seminole substation: 6 requests in the SPP queue, 3 active totaling 500.1 MW.

Queue IDProjectMWResourceStatus
GEN-2017-092Not reported200SolarActive
GEN-2018-024Not reported100BatteryActive
GEN-2017-044Not reported200.1WindWithdrawn
GEN-2017-045Not reported200.1WindWithdrawn
GEN-2017-046Not reported200.1WindWithdrawn

Ochiltree, TX: 11 requests in the SPP queue, 2 active totaling 252.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2017-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2017-05-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.