Canadian River-Muskogee and Muskogee-Seminole substation interconnection queue
3 active projects totaling 500.1 MW in the SPP queue, plus 3 with terminal status (shown grayed).
3active projects
500.1active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-040 | Not reported | 345 | 200.1 | Solar | Active |
| GEN-2017-044 | Not reported | 345 | 200.1 | Wind | Withdrawn |
| GEN-2017-045 | Not reported | 345 | 200.1 | Wind | Withdrawn |
| GEN-2017-046 | Not reported | 345 | 200.1 | Wind | Withdrawn |
| GEN-2017-092 | Not reported | 345 | 200 | Solar | Active |
| GEN-2018-024 | Not reported | 345 | 100 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.