Ochiltree, TX interconnection queue

2 active projects totaling 252.7 MW in the SPP queue, plus 9 with terminal status (shown grayed).

2active projects
252.7active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2013-030 Not reported 345 300 Wind Withdrawn
GEN-2023-123 Not reported 230 285 Wind Withdrawn
GEN-2023-125 Not reported 230 250 Wind Withdrawn
GEN-2017-040 Not reported 345 200.1 Solar Active
GEN-2017-044 Not reported 345 200.1 Wind Withdrawn
GEN-2017-045 Not reported 345 200.1 Wind Withdrawn
GEN-2017-046 Not reported 345 200.1 Wind Withdrawn
GEN-2023-124 Not reported 115 200 Wind Withdrawn
GEN-2015-006 Not reported 345 150 Wind Withdrawn
GEN-2026-PR1 Not reported 345 52.6 Wind Active
GEN-2014-019 Not reported 345 15 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.