Post Rock substation interconnection queue

2 active projects totaling 220.5 MW in the SPP queue.

2 SPP queue filings name Post Rock as the point of interconnection, all in Ellis County, KS.

2active projects
220.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-092 Not reported 230 200.5 Wind Operational
GEN-2016-160 Not reported 230 20 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.