Substation Scout

SPP request GEN-2016-153

SPP queue ID GEN-2016-153

Queue request GEN-2016-153 was listed in the SPP interconnection queue at the end of 2025 as a 134 MW wind project in Harper County, KS, according to Berkeley Lab’s queue data file. The filing names Viola as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2024.

Queue IDGEN-2016-153
Project nameNot reported
Status (as published)Operational
SubstationViola
Point of interconnectionViola 345kV
CountyHarper
StateKS
Voltage345 kV
Capacity134 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2024-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Viola substation: 7 requests in the SPP queue, 5 active totaling 924.4 MW.

Queue IDProjectMWResourceStatus
GEN-2007-025Not reported299.2WindOperational
GEN-2010-005Not reported299.2WindOperational
GEN-2017-086Not reported150WindActive
GEN-2021-SR8Not reported42SolarActive
GEN-2017-206Not reported300SolarWithdrawn
GEN-2012-023Not reported115WindWithdrawn

Harper, KS: 10 requests in the SPP queue, 6 active totaling 1,100.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2016-002-1; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2016-11-30
Operational date2025-06-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first