Viola substation interconnection queue
5 active projects totaling 924.4 MW in the SPP queue, plus 2 with terminal status (shown grayed).
7 SPP queue filings name Viola as the point of interconnection, all in KS.
5active projects
924.4active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-206 | Not reported | 345 | 300 | Solar | Withdrawn |
| GEN-2007-025 | Not reported | 345 | 299.2 | Wind | Operational |
| GEN-2010-005 | Not reported | 345 | 299.2 | Wind | Operational |
| GEN-2017-086 | Not reported | 345 | 150 | Wind | Active |
| GEN-2016-153 | Not reported | 345 | 134 | Wind | Operational |
| GEN-2012-023 | Not reported | 345 | 115 | Wind | Withdrawn |
| GEN-2021-SR8 | Not reported | 345 | 42 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.