Harper, KS interconnection queue

6 active projects totaling 1,100.2 MW in the SPP queue, plus 4 with terminal status (shown grayed).

6active projects
1,100.2active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-056 Not reported 345 300 Wind Active
GEN-2010-005 Not reported 345 299.2 Wind Operational
GEN-2024-274 Not reported 138 175 Solar Active
GEN-2012-006 Not reported 138 150 Wind Withdrawn
GEN-2017-086 Not reported 345 150 Wind Active
GEN-2022-195 Not reported 345 145 Wind Withdrawn
GEN-2016-010 Not reported 345 134 Wind Withdrawn
GEN-2016-153 Not reported 345 134 Wind Operational
GEN-2016-011 Not reported n/r 116 Wind Withdrawn
GEN-2021-SR8 Not reported 345 42 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.