SPP request GEN-2006-008

SPP queue ID GEN-2006-008

Queue request GEN-2006-008 was listed in the SPP interconnection queue at the end of 2025 as a 550 MW gas project in Caddo Parish, LA, according to Berkeley Lab’s queue data file. The filing names Arsenal Hill as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 26, 2010.

Queue IDGEN-2006-008
Project nameNot reported
Status (as published)Operational
SubstationArsenal Hill
Point of interconnectionArsenal Hill 138kV
CountyCaddo Parish
StateLA
Voltage138 kV
Capacity550 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2010-06-26
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Arsenal Hill substation: 2 requests in the SPP queue, 2 active totaling 580 MW.

Queue IDProjectMWResourceStatus
GEN-2008-006Not reported30GasOperational

Caddo Parish, LA: 21 requests in the SPP queue, 8 active totaling 1,182 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2006-02-27
Operational date2010-06-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.