Arsenal Hill substation interconnection queue

2 active projects totaling 580 MW in the SPP queue.

2 SPP queue filings name Arsenal Hill as the point of interconnection, all in Caddo Parish, LA.

2active projects
580active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-008 Not reported 138 550 Gas Operational
GEN-2008-006 Not reported 138 30 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.