Caddo Parish, LA interconnection queue

8 active projects totaling 1,182 MW in the SPP queue, plus 13 with terminal status (shown grayed).

8active projects
1,182active MW
21total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-016 Not reported n/r 1,115 Gas Withdrawn
GEN-2001-038 Not reported n/r 900 Gas Withdrawn
GEN-2001-019 Not reported n/r 750 Gas Withdrawn
GEN-2001-017 Not reported n/r 557 Gas Withdrawn
GEN-2006-008 Not reported 138 550 Gas Operational
GEN-2006-009 Not reported n/r 550 Gas Withdrawn
GEN-2018-050 Not reported 345 200 Solar Active
GEN-2023-155 Not reported 138 200 Solar Withdrawn
GEN-2018-106 Not reported 345 165 Solar Active
GEN-2016-167 Not reported 138 73.5 Solar Active
GEN-2023-SR23 Not reported 138 73.5 Battery Withdrawn
GEN-2017-057 Not reported 69 72.5 Solar Active
GEN-2019-049 Not reported 138 60 Battery Withdrawn
GEN-2024-220 Not reported 69 55 Hybrid Active
GEN-2017-070 Not reported 138 52.2 Solar Withdrawn
GEN-2018-105 Not reported 345 50 Battery Withdrawn
GEN-2022-185 Not reported 138 46 Gas Withdrawn
GEN-2024-044 Not reported 69 36 Hybrid Active
GEN-2024-126 Not reported 12.5 32.7 Gas Withdrawn
GEN-2008-006 Not reported 138 30 Gas Operational
GEN-2011-033 Not reported 138 10.8 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.