Substation Scout

SPP request GEN-2004-017

SPP queue ID GEN-2004-017

Queue request GEN-2004-017 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW gas project in Cherokee County, KS, according to Berkeley Lab’s queue data file. The filing names Riverton as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 1, 2007.

Queue IDGEN-2004-017
Project nameNot reported
Status (as published)Operational
SubstationRiverton
Point of interconnectionRiverton 161kV
CountyCherokee
StateKS
Voltage161 kV
Capacity250 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2007-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Riverton substation: 2 requests in the SPP queue, 2 active totaling 300 MW.

Queue IDProjectMWResourceStatus
GEN-2014-028Not reported50GasOperational

Cherokee, KS: 8 requests in the SPP queue, 4 active totaling 552.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEDE
Cluster03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2004-08-23
Operational date2007-01-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first