Substation Scout

Riverton substation interconnection queue

2 active projects totaling 300 MW in the SPP queue.

2 SPP queue filings name Riverton as the point of interconnection, all in Cherokee County, KS.

2active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2004-017 Not reported 161 250 Gas Operational
GEN-2014-028 Not reported 161 50 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first