Cherokee, KS interconnection queue
4 active projects totaling 552.1 MW in the SPP queue, plus 4 with terminal status (shown grayed).
4active projects
552.1active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2004-017 | Not reported | 161 | 250 | Gas | Operational |
| GEN-2020-079 | Not reported | 161 | 225 | Hybrid | Active |
| GEN-2023-194 | Not reported | 161 | 225 | Solar | Withdrawn |
| GEN-2023-004 | Not reported | 161 | 200 | Hybrid | Withdrawn |
| GEN-2023-191 | Not reported | 138 | 74 | Battery | Withdrawn |
| GEN-2003-010 | Not reported | n/r | 50 | Gas | Withdrawn |
| GEN-2014-028 | Not reported | 161 | 50 | Gas | Operational |
| GEN-2024-GR4 | Not reported | n/r | 27.1 | Other | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.