SPP request ERAS-2025-016
SPP queue ID ERAS-2025-016
Queue request ERAS-2025-016 was listed in the SPP interconnection queue at the end of 2025 as a 232.5 MW gas project in Lamb County, TX, according to Berkeley Lab’s queue data file. The filing names Tolk Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2029.
| Queue ID | ERAS-2025-016 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Tolk Substation |
| Point of interconnection | Tolk 230kV Substation |
| County | Lamb |
| State | TX |
| Voltage | 230 kV |
| Capacity | 232.5 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2029-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Tolk Substation substation: 10 requests in the SPP queue, 3 active totaling 797.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| GEN-2018-099 | Not reported | 300 | Wind | Active |
| GEN-2017-158 | Not reported | 265 | Wind | Active |
| GEN-2022-036 | Not reported | 1,000 | Solar | Withdrawn |
| GEN-2023-240 | Not reported | 550 | Solar | Withdrawn |
| GEN-2022-035 | Not reported | 300 | Wind | Withdrawn |
| GEN-2022-201 | Not reported | 300 | Wind | Withdrawn |
| GEN-2024-149 | Not reported | 196.4 | Solar | Withdrawn |
| GEN-2018-097 | Not reported | 100 | Solar | Withdrawn |
| GEN-2024-148 | Not reported | 100 | Solar | Withdrawn |
Lamb, TX: 34 requests in the SPP queue, 3 active totaling 638.5 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | SPS |
|---|---|
| Cluster | ERAS-2025-001; 05 SOUTHWEST |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | ERAS |
| Queue date | 2025-10-02 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.