Tolk Substation substation interconnection queue
3 active projects totaling 797.5 MW in the SPP queue, plus 7 with terminal status (shown grayed).
10 SPP queue filings name Tolk Substation as the point of interconnection, all in TX.
3active projects
797.5active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-036 | Not reported | 345 | 1,000 | Solar | Withdrawn |
| GEN-2023-240 | Not reported | 345 | 550 | Solar | Withdrawn |
| GEN-2018-099 | Not reported | 230 | 300 | Wind | Active |
| GEN-2022-035 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2022-201 | Not reported | 230 | 300 | Wind | Withdrawn |
| GEN-2017-158 | Not reported | 230 | 265 | Wind | Active |
| ERAS-2025-016 | Not reported | 230 | 232.5 | Gas | Active |
| GEN-2024-149 | Not reported | 345 | 196.4 | Solar | Withdrawn |
| GEN-2018-097 | Not reported | 230 | 100 | Solar | Withdrawn |
| GEN-2024-148 | Not reported | 345 | 100 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.