Tolk Substation substation interconnection queue

3 active projects totaling 797.5 MW in the SPP queue, plus 7 with terminal status (shown grayed).

10 SPP queue filings name Tolk Substation as the point of interconnection, all in TX.

3active projects
797.5active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-036 Not reported 345 1,000 Solar Withdrawn
GEN-2023-240 Not reported 345 550 Solar Withdrawn
GEN-2018-099 Not reported 230 300 Wind Active
GEN-2022-035 Not reported 345 300 Wind Withdrawn
GEN-2022-201 Not reported 230 300 Wind Withdrawn
GEN-2017-158 Not reported 230 265 Wind Active
ERAS-2025-016 Not reported 230 232.5 Gas Active
GEN-2024-149 Not reported 345 196.4 Solar Withdrawn
GEN-2018-097 Not reported 230 100 Solar Withdrawn
GEN-2024-148 Not reported 345 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.