SPP request ERAS-2025-012
SPP queue ID ERAS-2025-012
Queue request ERAS-2025-012 was listed in the SPP interconnection queue at the end of 2025 as a 750 MW gas project in Mercer County, ND, according to Berkeley Lab’s queue data file. The filing names Leland Olds Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 27, 2030.
| Queue ID | ERAS-2025-012 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Leland Olds Substation |
| Point of interconnection | Leland Olds 345kV Substation |
| County | Mercer |
| State | ND |
| Voltage | 345 kV |
| Capacity | 750 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2030-09-27 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Leland Olds Substation substation: 2 requests in the SPP queue, 2 active totaling 1,500 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| ERAS-2025-011 | Not reported | 750 | Gas | Active |
Mercer, ND: 14 requests in the SPP queue, 6 active totaling 2,475 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | BEPC |
|---|---|
| Cluster | ERAS-2025-001; 01 NORTH |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | ERAS |
| Queue date | 2025-10-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.