Substation Scout

Leland Olds Substation substation interconnection queue

2 active projects totaling 1,500 MW in the SPP queue.

2 SPP queue filings name Leland Olds Substation as the point of interconnection, all in Mercer County, ND.

2active projects
1,500active MW
2total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-011 Not reported 345 750 Gas Active
ERAS-2025-012 Not reported 345 750 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.