Mercer, ND interconnection queue
6 active projects totaling 2,475 MW in the SPP queue, plus 8 with terminal status (shown grayed).
6active projects
2,475active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| ERAS-2025-011 | Not reported | 345 | 750 | Gas | Active |
| ERAS-2025-012 | Not reported | 345 | 750 | Gas | Active |
| GEN-2021-072 | Not reported | 345 | 600 | Solar | Withdrawn |
| GEN-2021-094 | Not reported | 345 | 446.5 | Gas | Withdrawn |
| GEN-2021-095 | Not reported | 345 | 446.5 | Gas | Withdrawn |
| GEN-2024-141 | Not reported | 230 | 424 | Wind | Active |
| GEN-2016-130 | Not reported | 345 | 202 | Wind | Operational |
| GEN-2016-108 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2024-191 | Not reported | 345 | 199 | Battery | Withdrawn |
| GEN-2024-192 | Not reported | 345 | 199 | Battery | Withdrawn |
| GEN-2024-284 | Not reported | 345 | 199 | Solar | Active |
| GEN-2019-037 | Not reported | 345 | 150 | Solar | Active |
| GEN-2024-174 | Not reported | 115 | 130 | Battery | Withdrawn |
| GEN-2021-100 | Not reported | 345 | 50 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.