Yoakum, TX interconnection queue
13 active projects totaling 2,533 MW in the SPP queue, plus 9 with terminal status (shown grayed).
13active projects
2,533active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2021-090 | Not reported | 345 | 400 | Hybrid | Active |
| GEN-2016-081 | Not reported | n/r | 300 | Wind | Withdrawn |
| GEN-2017-239 | Not reported | 230 | 300 | Solar | Active |
| GEN-2024-336 | Not reported | 230 | 300 | Hybrid | Active |
| GEN-2024-SR15 | Not reported | 230 | 300 | Battery | Active |
| GEN-2024-SR4 | Not reported | 230 | 300 | Battery | Withdrawn |
| GEN-2024-015 | Not reported | 230 | 280 | Hybrid | Active |
| ERAS-2025-027 | Not reported | 230 | 250 | Battery | Active |
| GEN-2016-058 | Not reported | 345 | 212 | Solar | Withdrawn |
| GEN-2019-011 | Not reported | 345 | 207 | Battery | Active |
| GEN-2011-048 | Not reported | 230 | 175 | Gas | Operational |
| GEN-2004-015 | Not reported | n/r | 150 | Gas | Operational |
| GEN-2006-015 | Not reported | 230 | 150 | Gas | Operational |
| GEN-2018-019 | Not reported | 115 | 100 | Solar | Withdrawn |
| GEN-2015-040 | Not reported | 230 | 50.1 | Solar | Withdrawn |
| GEN-2015-078 | Not reported | 115 | 50.1 | Solar | Withdrawn |
| GEN-2012-008 | Not reported | 115 | 40 | Gas | Withdrawn |
| GEN-2012-009 | Not reported | 230 | 15 | Gas | Withdrawn |
| GEN-2012-010 | Not reported | 230 | 15 | Gas | Withdrawn |
| GEN-2012-034 | Not reported | 230 | 7 | Gas | Operational |
| GEN-2012-035 | Not reported | 230 | 7 | Gas | Operational |
| GEN-2012-036 | Not reported | 230 | 7 | Gas | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.