Yoakum, TX interconnection queue

13 active projects totaling 2,533 MW in the SPP queue, plus 9 with terminal status (shown grayed).

13active projects
2,533active MW
22total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-090 Not reported 345 400 Hybrid Active
GEN-2016-081 Not reported n/r 300 Wind Withdrawn
GEN-2017-239 Not reported 230 300 Solar Active
GEN-2024-336 Not reported 230 300 Hybrid Active
GEN-2024-SR15 Not reported 230 300 Battery Active
GEN-2024-SR4 Not reported 230 300 Battery Withdrawn
GEN-2024-015 Not reported 230 280 Hybrid Active
ERAS-2025-027 Not reported 230 250 Battery Active
GEN-2016-058 Not reported 345 212 Solar Withdrawn
GEN-2019-011 Not reported 345 207 Battery Active
GEN-2011-048 Not reported 230 175 Gas Operational
GEN-2004-015 Not reported n/r 150 Gas Operational
GEN-2006-015 Not reported 230 150 Gas Operational
GEN-2018-019 Not reported 115 100 Solar Withdrawn
GEN-2015-040 Not reported 230 50.1 Solar Withdrawn
GEN-2015-078 Not reported 115 50.1 Solar Withdrawn
GEN-2012-008 Not reported 115 40 Gas Withdrawn
GEN-2012-009 Not reported 230 15 Gas Withdrawn
GEN-2012-010 Not reported 230 15 Gas Withdrawn
GEN-2012-034 Not reported 230 7 Gas Operational
GEN-2012-035 Not reported 230 7 Gas Operational
GEN-2012-036 Not reported 230 7 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.