SPP request GEN-2024-015
SPP queue ID GEN-2024-015
Queue request GEN-2024-015 was listed in the SPP interconnection queue at the end of 2025 as a 280 MW hybrid project in Yoakum County, TX, according to Berkeley Lab’s queue data file. The filing names Sundown-Amaco-Yoakum Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2028.
| Queue ID | GEN-2024-015 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Sundown-Amaco-Yoakum Substation |
| Point of interconnection | Sundown-Amaco-Yoakum 230 kV Substation |
| County | Yoakum |
| State | TX |
| Voltage | 230 kV |
| Capacity | 280 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Yoakum, TX: 22 requests in the SPP queue, 13 active totaling 2,533 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | SPS |
|---|---|
| Cluster | DISIS-2024-001; 05 SOUTHWEST |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | System Impact Study |
| Study phase (as the queue printed it) | DISIS STAGE |
| Queue date | 2024-10-04 |
| Components (hybrid) | Solar 280 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.