SPP request GEN-2004-015

SPP queue ID GEN-2004-015

Queue request GEN-2004-015 was listed in the SPP interconnection queue at the end of 2025 as a 150 MW gas project in Yoakum County, TX, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2006.

Queue IDGEN-2004-015
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyYoakum
StateTX
VoltageNot reported
Capacity150 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2006-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Yoakum, TX: 22 requests in the SPP queue, 13 active totaling 2,533 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
Cluster05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2004-07-12
Operational date2006-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.