Webster, NE interconnection queue

3 active projects totaling 390.4 MW in the SPP queue, plus 6 with terminal status (shown grayed).

3active projects
390.4active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-050 Not reported 345 250.7 Wind Operational
GEN-2022-046 Not reported 345 150 Battery Withdrawn
GEN-2016-055 Not reported 155 126.5 Wind Withdrawn
GEN-2013-015 Not reported 115 125.8 Wind Withdrawn
GEN-2014-060 Not reported 115 125.8 Wind Withdrawn
GEN-2016-064 Not reported 115 116 Wind Withdrawn
GEN-2008-123N Not reported 115 89.7 Wind Operational
GEN-2018-060 Not reported 345 50 Wind Active
GEN-2013-014 Not reported 115 25.5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.