Substation Scout

SPP request GEN-2008-123N

SPP queue ID GEN-2008-123N

Queue request GEN-2008-123N was listed in the SPP interconnection queue at the end of 2025 as a 89.7 MW wind project in Webster County, NE, according to Berkeley Lab’s queue data file. The filing names Tap Pauline - Hildreth (Rosemont) as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 16, 2017.

Queue IDGEN-2008-123N
Project nameNot reported
Status (as published)Operational
SubstationTap Pauline - Hildreth (Rosemont)
Point of interconnectionTap Pauline - Hildreth (Rosemont) 115kV
CountyWebster
StateNE
Voltage115 kV
Capacity89.7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2017-11-16
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Webster, NE: 9 requests in the SPP queue, 3 active totaling 390.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2010-001-8; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2008-11-12
Operational date2017-11-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first