SPP request GEN-2018-060

SPP queue ID GEN-2018-060

Queue request GEN-2018-060 was listed in the SPP interconnection queue at the end of 2025 as a 50 MW wind project in Webster County, NE, according to Berkeley Lab’s queue data file. The filing names Axtell-Post Rock as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2018-060
Project nameNot reported
Status (as published)Active
SubstationAxtell-Post Rock
Point of interconnectionAxtell-Post Rock 345 kV
CountyWebster
StateNE
Voltage345 kV
Capacity50 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Webster, NE: 9 requests in the SPP queue, 3 active totaling 390.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2018-001; 02 NEBRASKA
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2018-05-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.