Washington, NE interconnection queue
4 active projects totaling 548 MW in the SPP queue, plus 3 with terminal status (shown grayed).
4active projects
548active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2018-025 | Not reported | 345 | 200 | Battery | Suspended |
| GEN-2025-SR24 | Not reported | 345 | 200 | Other | Active |
| GEN-2018-090 | Not reported | 345 | 125 | Battery | Withdrawn |
| GEN-2020-078 | Not reported | 161 | 100 | Solar | Active |
| GEN-2007-030O | Not reported | n/r | 67 | Nuclear | Withdrawn |
| GEN-2019-072 | Not reported | 161 | 50 | Battery | Withdrawn |
| GEN-2004-002O | Not reported | n/r | 48 | Nuclear | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.