SPP request GEN-2020-078
SPP queue ID GEN-2020-078
Queue request GEN-2020-078 was listed in the SPP interconnection queue at the end of 2025 as a 100 MW solar project in Washington County, NE, according to Berkeley Lab’s queue data file. The filing names Substation to Substation , Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2022.
| Queue ID | GEN-2020-078 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Substation to Substation , Tap |
| Point of interconnection | Substation 1226 to Substation 1237, 161kV Tap |
| County | Washington |
| State | NE |
| Voltage | 161 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2022-11-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Washington, NE: 7 requests in the SPP queue, 4 active totaling 548 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OPPD |
|---|---|
| Cluster | DISIS-2020-001; 02 NEBRASKA |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | IA FULLY EXECUTED/ON SCHEDULE |
| Queue date | 2020-04-30 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.