SPP request GEN-2004-002O

SPP queue ID GEN-2004-002O

Queue request GEN-2004-002O was listed in the SPP interconnection queue at the end of 2025 as a 48 MW nuclear project in Washington County, NE, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 1, 2007.

Queue IDGEN-2004-002O
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyWashington
StateNE
VoltageNot reported
Capacity48 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Proposed online date2007-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Washington, NE: 7 requests in the SPP queue, 4 active totaling 548 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2004-01-21
Operational date2007-01-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.