Queue request GEN-2011-046 was listed in the SPP interconnection queue at the end of 2025 as a 23 MW gas project in Quay County, NM, according to Berkeley Lab’s queue data file. The filing names Tucumcari as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 5, 2013.

Queue IDGEN-2011-046
Project nameNot reported
Status (as published)Operational
SubstationTucumcari
Point of interconnectionTucumcari 115kV
CountyQuay
StateNM
Voltage115 kV
Capacity23 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2013-09-05
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Quay, NM: 12 requests in the SPP queue, 3 active totaling 128 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2011-002-6; 05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2011-09-29
Operational date2013-09-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first