SPP request GEN-2025-SR8

SPP queue ID GEN-2025-SR8

Queue request GEN-2025-SR8 was listed in the SPP interconnection queue at the end of 2025 as a 220 MW battery project in Noble County, OK, according to Berkeley Lab’s queue data file. The filing names White Tail Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 24, 2027.

Queue IDGEN-2025-SR8
Project nameNot reported
Status (as published)Active
SubstationWhite Tail Substation
Point of interconnectionWhite Tail 345kV Substation
CountyNoble
StateOK
Voltage345 kV
Capacity220 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-01-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Noble, OK: 17 requests in the SPP queue, 7 active totaling 1,173.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2025-05-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.