Substation Scout

Nemaha, NE interconnection queue

4 active projects totaling 824 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4active projects
824active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-110 Not reported 345 500 Wind Withdrawn
GEN-2024-038 Not reported 161 300 Solar Active
GEN-2024-039 Not reported 161 250 Solar Active
GEN-2024-040 Not reported 345 174 Solar Active
GEN-2012-017 Not reported 345 115 Nuclear Withdrawn
GEN-2019-009 Not reported 161 100 Solar Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.