SPP request GEN-2024-038
SPP queue ID GEN-2024-038
Queue request GEN-2024-038 was listed in the SPP interconnection queue at the end of 2025 as a 300 MW solar project in Nemaha County, NE, according to Berkeley Lab’s queue data file. The filing names Cooper - S12080 line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.
| Queue ID | GEN-2024-038 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Cooper - S12080 line |
| Point of interconnection | Cooper - S12080 161 kV line |
| County | Nemaha |
| State | NE |
| Voltage | 161 kV |
| Capacity | 300 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2029-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Nemaha, NE: 6 requests in the SPP queue, 4 active totaling 824 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OPPD |
|---|---|
| Cluster | DISIS-2024-001; 02 NEBRASKA |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | System Impact Study |
| Study phase (as the queue printed it) | DISIS STAGE |
| Queue date | 2024-10-30 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.