Queue request GEN-2019-037 was listed in the SPP interconnection queue at the end of 2025 as a 150 MW solar project in Mercer County, ND, according to Berkeley Lab’s queue data file. The filing names Leland Olds substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2023.

Queue IDGEN-2019-037
Project nameNot reported
Status (as published)Active
SubstationLeland Olds substation
Point of interconnectionLeland Olds 345kV substation
CountyMercer
StateND
Voltage345 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Leland Olds substation substation: 2 requests in the SPP queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
GEN-2021-100Not reported50BatteryWithdrawn

Mercer, ND: 14 requests in the SPP queue, 6 active totaling 2,475 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityBEPC
ClusterDISIS-2019-001; 01 NORTH
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2019-05-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first