Substation Scout

Mcclain, OK interconnection queue

3 active projects totaling 820 MW in the SPP queue, plus 4 with terminal status (shown grayed).

3active projects
820active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-013 Not reported 345 496 Gas Active
GEN-2017-153 Not reported 138 253 Wind Withdrawn
GEN-2017-152 Not reported 138 252 Wind Withdrawn
GEN-2017-168 Not reported 138 250 Solar Withdrawn
GEN-2024-187 Not reported 138 199 Battery Active
GEN-2025-SR15 Not reported n/r 125 Other Active
GEN-2017-169 Not reported 138 52 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.