Substation Scout

SPP request GEN-2025-SR15

SPP queue ID GEN-2025-SR15

Queue request GEN-2025-SR15 was listed in the SPP interconnection queue at the end of 2025 as a 125 MW project in Mcclain County, OK, according to Berkeley Lab’s queue data file. The filing names McClain Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2029.

Queue IDGEN-2025-SR15
Project nameNot reported
Status (as published)Active
SubstationMcClain Substation
Point of interconnectionMcClain Substation
CountyMcclain
StateOK
VoltageNot reported
Capacity125 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2029-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mcclain, OK: 7 requests in the SPP queue, 3 active totaling 820 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)None
Queue date2025-05-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first