SPP request GEN-2024-013
SPP queue ID GEN-2024-013
Queue request GEN-2024-013 was listed in the SPP interconnection queue at the end of 2025 as a 496 MW gas project in Mcclain County, OK, according to Berkeley Lab’s queue data file. The filing names Norman Hills as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2030.
| Queue ID | GEN-2024-013 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Norman Hills |
| Point of interconnection | Norman Hills 345 kV |
| County | Mcclain |
| State | OK |
| Voltage | 345 kV |
| Capacity | 496 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2030-01-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mcclain, OK: 7 requests in the SPP queue, 3 active totaling 820 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OGE |
|---|---|
| Cluster | DISIS-2024-001; 04 SOUTHEAST |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | System Impact Study |
| Study phase (as the queue printed it) | DISIS STAGE |
| Queue date | 2024-08-02 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.