SPP request GEN-2016-028

SPP queue ID GEN-2016-028

Queue request GEN-2016-028 was listed in the SPP interconnection queue at the end of 2025 as a 100 MW wind project in Le Flore County, OK, according to Berkeley Lab’s queue data file. The filing names Clayton Sub as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 27, 2019.

Queue IDGEN-2016-028
Project nameNot reported
Status (as published)Operational
SubstationClayton Sub
Point of interconnectionClayton 138 kV Sub
CountyLe Flore
StateOK
Voltage138 kV
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2019-12-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Le Flore, OK: 6 requests in the SPP queue, 3 active totaling 436 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2016-001-3; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2016-03-29
Operational date2019-12-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.