14 active projects totaling 1,903.2 MW in the SPP queue, plus 9 with terminal status (shown grayed).

14active projects
1,903.2active MW
23total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-GR6 Not reported 345 300 Wind Active
GEN-2012-032 Not reported 345 299 Wind Operational
GEN-2023-211 Not reported 345 250 Hybrid Withdrawn
GEN-2015-001 Not reported 345 200 Wind Operational
GEN-2015-034 Not reported 345 200 Wind Operational
GEN-2016-022 Not reported 345 151.8 Wind Operational
GEN-2018-071 Not reported 345 151 Battery Active
GEN-2018-072 Not reported 345 151 Battery Active
GEN-2016-148 Not reported 138 150 Wind Withdrawn
GEN-2024-334 Not reported 345 124 Gas Active
GEN-2012-041 Not reported 345 121.5 Gas Operational
GEN-2008-071 Not reported 138 76.8 Wind Withdrawn
GEN-2012-040 Not reported 138 76.5 Wind Withdrawn
GEN-2016-071 Not reported 138 64.6 Wind Active
GEN-2009-025 Not reported 69 59.8 Wind Operational
GEN-2022-SR6 Not reported 69 50 Battery Withdrawn
GEN-2023-SR3 Not reported 69 50 Battery Withdrawn
GEN-2024-SR17 Not reported 138 50 Battery Active
GEN-2016-009 Not reported 69 29 Gas Operational
GEN-2015-035 Not reported n/r 22 Gas Withdrawn
GEN-2014-022 Not reported 345 15 Wind Withdrawn
GEN-2015-028 Not reported 69 3 Wind Withdrawn
GEN-2016-031 Not reported 345 1.5 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first