SPP request GEN-2024-GR6

SPP queue ID GEN-2024-GR6

Queue request GEN-2024-GR6 was listed in the SPP interconnection queue at the end of 2025 as a 300 MW wind project in Kay County, OK, according to Berkeley Lab’s queue data file. The filing names Open Sky Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2027.

Queue IDGEN-2024-GR6
Project nameNot reported
Status (as published)Active
SubstationOpen Sky Substation
Point of interconnectionOpen Sky 345kV Substation
CountyKay
StateOK
Voltage345 kV
Capacity300 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2027-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kay, OK: 23 requests in the SPP queue, 14 active totaling 1,903.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterReplacement; 04 SOUTHEAST
Interconnection serviceERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2024-07-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.