SPP request GEN-2016-071

SPP queue ID GEN-2016-071

Queue request GEN-2016-071 was listed in the SPP interconnection queue at the end of 2025 as a 64.6 MW wind project in Kay County, OK, according to Berkeley Lab’s queue data file. The filing names Middleton Tap Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 27, 2028.

Queue IDGEN-2016-071
Project nameNot reported
Status (as published)Active
SubstationMiddleton Tap Substation
Point of interconnectionMiddleton Tap 138kV Substation
CountyKay
StateOK
Voltage138 kV
Capacity64.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-02-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kay, OK: 23 requests in the SPP queue, 14 active totaling 1,903.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2016-001-3; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2016-03-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.