Queue IDProjectkVMWResourceStatus
GEN-2003-011 Not reported n/r 600 Gas Withdrawn
GEN-2003-007 Not reported n/r 550 Coal Withdrawn
ERAS-2025-034 Not reported 161 250 Gas Active
GEN-2017-189 Not reported 345 201.6 Solar Withdrawn
GEN-2023-226 Not reported 161 200 Battery Withdrawn
GEN-2009-027 Not reported 345 150 Wind Withdrawn
GEN-2009-028 Not reported 345 150 Wind Withdrawn
GEN-2020-088 Not reported 161 150 Solar Active
GEN-2023-017 Not reported 161 150 Battery Withdrawn
GEN-2021-059 Not reported 161 130 Solar Withdrawn
GEN-2018-053 Not reported 161 100 Wind Withdrawn
GEN-2023-061 Not reported 161 100 Battery Active
GEN-2024-091 Not reported 161 100 Battery Active
GEN-2023-233 Not reported 161 74.9 Battery Withdrawn
GEN-2019-078 Not reported n/r 70 Gas Withdrawn
GEN-2020-064 Not reported 161 64 Gas Active
GEN-2001-030 Not reported 161 50 Gas Operational
GEN-2001-040 Not reported 161 50 Gas Operational
GEN-2018-061 Not reported 161 50 Wind Withdrawn
GEN-2022-084 Not reported 69 11.5 Solar Withdrawn
GEN-2016-013 Not reported 161 10 Gas Operational
GEN-2016-014 Not reported 161 10 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first